A menu change touches more of the kitchen than it first appears.

Use this checklist to work from the idea to launch: define the change, see what it requires, test it against your kitchen, decide on equipment and launch it with a trial.

Five Phases, One List

Each phase builds on the one before.

Tick each box as you go, and print it to share.

Specialist support: Want help working through it? We can go through the list with you.

Who This Checklist Is For

Operators adding, changing or simplifying a menu in an existing kitchen.

Restaurants Cafés Bakeries Pizza Shops Pubs and Bars QSR Food Trucks Hotels and Banquets Healthcare Education

One List for the Whole Change

Use this checklist from idea to launch.

A menu change touches more of the kitchen than it first appears. This checklist walks through five phases, from defining the change to testing and launching it, with what to confirm and who to ask.

Print it, or work through it with your team. Tick each box as you go.

How to use this page

  • Work through the phases in order.
  • Come back to earlier ones if an answer changes.
  • Print it to take to your team or specialist.
Define
Requirements
Test
Equipment
Launch

Back to top

Phase 1: Define the Change

Start with what is changing, not equipment.

Be specific about what is changing, how much you expect to sell and how it will reach the customer.

Decide here

  • What is changing.
  • Expected demand.
  • Service channels.
Phase 1: Define the change
Check What to confirm Who to ask Done
What is changing Adding a few items, a new category, a bigger category, a new daypart, takeout or delivery, catering, a major concept change or a simplification You and your chef
Operation type Which operation you run, so guidance matches You
New production method No new method, some new prep or cooking, a significant new process, or not sure Chef or kitchen manager
Expected demand Limited, a regular part of the menu, high volume or not sure yet You and your chef
Service channels Dine-in, counter, takeout, delivery, grab-and-go or catering You

Back to top

Phase 2: What the New Menu Requires

Walk the item from delivery to dish pit.

Go through ingredients, prep, production, holding, service and cleaning.

Look for

  • Anything new to your kitchen.
  • Shared processes.
  • Stages with no spare room.
Phase 2: What the new menu requires
Check What to confirm Who to ask Done
Ingredients New refrigerated, frozen, dry or bulk items, and any special handling Chef and purchasing
Prep Cutting, slicing, mixing, portioning, marinating, dough or batch work Chef or kitchen manager
Production Frying, grilling, baking, steaming, boiling, blending or something specialized Chef
Holding Hot or cold holding, proofing, cooling, display or immediate service Chef
Service How the item reaches the customer, and any packaging needed Front of house and chef
Cleaning Extra pots, pans, utensils, containers, glassware or dishware Kitchen manager

See Before You Add It.

Back to top

Phase 3: Test It Against Your Current Kitchen

Ask about your busiest realistic service.

Check each area against peak demand, not an average.

Name

  • The one or two pressure points.
  • The unknowns to measure.
Phase 3: Test it against your current kitchen
Check What to confirm Who to ask Done
Storage Enough appropriate storage for added ingredients and prepared product Kitchen manager
Prep capacity Can the added work be done in the time it has to happen Chef
Production capacity Existing equipment has capacity at peak, not just on a quiet shift Chef
Holding Finished product can be held safely without hurting service Chef
Handoff The item can move through assembly and service without slowing other orders Front of house and chef
Warewashing Cleaning can absorb the additional load Kitchen manager
Biggest pressure point Which one or two areas will be under the most strain Your team

See Finding the Bottleneck.

Back to top

Phase 4: Decide on Equipment

Use, reconfigure, add capacity or add a new function.

Start with what you have. Only add where the requirements call for it.

Remember

  • New menu does not always mean new equipment.
  • Ventilation and utilities come with new cooking methods.
Phase 4: Decide on equipment
Check What to confirm Who to ask Done
Use existing Which requirements current equipment can meet Chef and service provider
Reconfigure Which can be met by changing timing, placement or workflow Chef
Add capacity Where the function exists but not enough of it Chef and your specialist
Add a new function Where the menu needs a process the kitchen does not support Your specialist
Ventilation Whether the hood, makeup air and fire suppression suit any new cooking equipment Ventilation designer and local authority
Utilities Gas, electrical, water and drains for anything new Your trades and utility

See Adding Fried Food for an example.

Back to top

Phase 5: Test and Launch

Prove it in your real kitchen first.

Run a controlled test where practical, then decide with what you learned.

Plan to

  • Measure.
  • Train.
  • Review and adjust.
Phase 5: Test and launch
Check What to confirm Who to ask Done
Trial A controlled test of the change in your real kitchen, where practical You and your chef
Measures Prep time, production time, peak behaviour, storage, handoff and cleaning Your team
Training Staff trained on new items and equipment before launch Chef or kitchen manager
Pilot or phased launch Whether to start with a limited offer before the full change You
Review A set date to review results and adjust or drop what does not work You

See Test Before You Invest.

Back to top

Frequently Asked Questions

Short answers to the questions we hear most.

Do I need to complete every phase?

For a small change, you may be able to move quickly. For a new method, high volume or a new channel, work through all five.

What if I do not know the answers?

Treat the unknowns as things to measure in a trial.

Where do equipment and ventilation come in?

In phase 4, after you know what the menu requires and what the kitchen can already do.

Can I print this?

Yes. Use the print button near the top. The tables print with tick boxes.

Can Russell Hendrix help?

Yes. A specialist can work through the list with you.

Back to top

Where This Guidance Comes From

We built this from published guidance. We name it so you can read it yourself.

These are the public sources behind this post. Most come from trade publications and equipment suppliers, and some are written for the United States. Codes, permits and inspections differ by province, city and authority, so treat them as general guidance, not a ruling for your kitchen.

Always confirm locally

  • Your local public health unit
  • Your municipal building and fire departments
  • Your gas, electrical and ventilation trades, who are authorized in your province

Back to top

When to Involve a Specialist

A menu change is easier with the equipment side in view.

A Russell Hendrix specialist can walk through what your menu change asks of the kitchen, help you decide whether you need new equipment at all and flag utility and ventilation questions for your trades.

Bring in Sales when

  • The change adds a new cooking method.
  • You expect the new item to be high volume.
  • Your existing equipment is already busy at peak.
  • Utilities or ventilation may need to change.

Back to top

Work the List, Then Launch

The strongest menu changes are planned before they are bought.

Define
Requirements
Test
Equipment
Launch

Prefer to build a personalized plan online? Use the journey.

Back to top